Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Dec 19, 2022     MoreElevator and HS tips - (4 hours)       Category: Tail Feathers
Added some fairing filler to the top of the right HS to to fill in a void from the factory. Reinforced the left HS tip after removing the foam with three strips of glass and epoxy per the instructions. Used a heat gun and wedge to spread the HS tips a little to match the profile of the HS. Sam added a strip of glass and epoxy to both elevator tips at the tip/elevator interface. Added some epoxy and fairing filler to the aft surface of the HS tips to sand down and contour with the elevator tips


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.